The project involved work to upgrade the wastewater treatment plant and its final discharge point serving the Casamassima urban area, aimed at bringing the facility into compliance with the requirements set forth in the updated Water Protection Plan and ensuring full adherence to the wastewater treatment parameters mandated by current regulations. The work primarily focused on the wastewater treatment line, beginning with the renovation of the pretreatment stations—which include sections dedicated to screening and grit removal—and then proceeding to the equalization and storage tank and the biological treatment section, which consists of denitrification and oxidation-nitrification stations arranged in a dual-line configuration. The wastewater then passes through secondary sedimentation and tertiary treatment, based on mechanical fabric filtration and ultraviolet disinfection, supplemented by a dedicated emergency line. At the same time, the treatment cycle was extended to the sludge line through the implementation of sections dedicated to aerobic digestion and mechanical dewatering, while on the environmental and structural front, plant improvements were introduced consisting of the upgrading of the electrical substation and generator sets, the installation of hydraulic and aeraulic connections, the resurfacing of roadways and the stormwater drainage network, and the installation of advanced deodorization and continuous odor monitoring systems. The project was finally completed with the construction of the permanent final discharge system using drainage trenches, the installation of green screens for landscape mitigation, and the general landscaping of the construction site’s outdoor areas.