The project involved the completion of the water treatment system at the Bova water treatment plant, in the municipality of Belfiore (VR), built to replace the PFAS-contaminated water sources in the Almisano area and supply the affected municipalities with good-quality water. Since the water drawn from the wells contains manganese and, to a lesser extent, iron, the plant was equipped with a pyrolusite filtration water treatment system, divided into two sections. The eastern section, completed in 2023, was supplemented by the western section, constructed as part of this project within an underground reinforced concrete tank adjacent to the existing reservoir. The new section houses three filters, each with a capacity of 50 l/s, for a total capacity of 150 l/s, and an oxidizer, which can be replaced by a fourth filter to increase capacity to 200 l/s. The section was connected to the existing pump room via all necessary piping, while the electrical system was expanded to include a dedicated automation and control panel, and the chlorination system was integrated with a new sodium hypochlorite dosing point. To manage the filter backwash water, a storage tank with a capacity of approximately 87 m³ was constructed, consisting of two prefabricated underground tanks that retain sediments before the wastewater is discharged—via the existing pumping station—into the Belfiore sewer system. Finally, several improvements were made to the existing structures, including new access ladders to the tanks and the eastern section, the reinforcement of a connecting joint, and the modification of the autoclave unit to facilitate maintenance.