Hydropotable supply works Scheme 39 PRGA 1st lot SAR 380 First compartment Intake and lifting works drinking water plant and related works – S.Vito (SU)

Project details

Contracting Station:

Flumendosa Autonomous Authority

Client:

Giovanni Putignano & Figli S.r.l.

Location:

St. Vitus (SU)

Job:

10/30/1015

Amount of Job:

7.574.397,16 €

Start date:

8/5/2002

Delivery date:

7/5/2004

Sector:

Drinking water plant
San Vito drinking water treatment plant
The purpose of this project was to ensure the drinking supply of the towns of Villaputzu, San Vito, Muravera, Villasimius, Castiadas and the tourist settlements along the east coast of Sardinia between Quirra and Villasimius, as well as the supply of irrigation users in the Muravera plain, through the use of water from the Flumendosa River. Specifically, the lot awarded to Putignano included the construction of an intake at Arcu S’Arena, the consortium drinking water plant with a capacity of 43,200 m3/d, a potable water lifting plant and a storage tank.

View plant on Maps

Gallery

Ricerca rapida….

Ricerca rapida….

Quick search….

Quick search….