Bubano (BO) Water Treatment Plant

Project details

Contracting Station:

HERAtech S.r.l.

Client:

ACCIONA AGUA S.A. – Giovanni Putignano & Figli S.r.l. – Zini Elio S.r.l.

Location:

Bubano (BO)

Job:

10/30/1104

Amount of Job:

€21,030,143.86

Start date:

15/5/2024

Delivery date:

in progress

Sector:

Civil Water Treatment Plant

"Design and construction of the "Bubano Plant Site" project in the municipality of Mordano (BO)"

Bubano Water Treatment Plant
The project involved the construction of a new municipal water treatment plant at the Bubano facility in the municipality of Mordano (BO) on behalf of Hera, as well as the optimization of the industrial treatment process at the same site. The new water treatment plant, fed by water from the “Lago Piccolo” (which in turn is supplied by the Canale Emiliano Romagnolo), was built with a nominal capacity of 160 l/s, capable of reaching a peak flow of 180 l/s, and is designed to be doubled in capacity to 320 l/s at a later date, thereby serving the municipalities in the area—from Mordano and Castel Bolognese to Riolo Terme and Solarolo—while also integrating the water systems of Imola. The treatment process is carried out on two parallel lines, with a complete treatment sequence that includes pre-oxidation, coagulation-flocculation, lamellar sedimentation, sand filtration, ozonation, activated carbon filtration, and final disinfection with chlorine dioxide, as well as a new storage tank with a capacity of 1,130 m³ that complements the existing 1,830 m³ tank. As for the industrial plant, with a capacity of 400 l/s, a new gravity sand filtration section consisting of six filter beds has been added. To properly treat the sludge and backwash water from the two plants, a single sludge treatment line was also constructed for the site, featuring storage and equalization tanks, sedimentation, thickening, and mechanical dewatering, which allows for the recovery of part of the water and reduces process losses. To improve the system’s reliability, the intake structure was upgraded—it now dedicates one pump to the municipal water treatment plant, two to the industrial plant, and one as a backup for both—and the electrical grid was upgraded with new transformer substations. The equipment is equipped with inverters and high-efficiency motors, while stormwater flows into a surge tank. The complex was built without interrupting service, keeping the existing plant operational until the new one became operational, and was complemented by a visitor center with a tour route open to the public.

View plant on Maps

Ricerca rapida….

Ricerca rapida….

Quick search….

Quick search….