The project involved the construction of the second phase of the interconnection works between the Fortore Aqueduct and the Locone-Ofanto water system, on behalf of Acquedotto Pugliese. A new DN 900 steel pipeline approximately 61 km long was constructed, connecting the Canosa isolation chamber to the Foggia reservoir, passing through the municipalities of Canosa di Puglia, San Ferdinando di Puglia, Cerignola, Orta Nova, Carapelle, Troia, and Foggia. The project allows the water supply to the Capitanata region to be supplemented with water from the Ofanto-Locone system—at a rate of approximately 200 l/s at full capacity—thereby reducing dependence on the Occhito reservoir, which is the sole water source for several communities in the province and is prone to algal contamination. Thanks to the connection with the Fortore Aqueduct, the pipeline can also operate in the opposite direction, carrying water from the Fortore to central Puglia and ensuring greater operational flexibility and fewer disruptions in the event of shutdowns or interruptions in the other lines. To ensure bidirectional operation, structures for regulating, intercepting, and measuring flow were built at both ends of the pipeline, while an intermediate chlorination station and numerous discharge and vent manholes were installed along the route. The pipeline, laid in its own trench almost entirely, required no-dig crossings under highways, railroads, state and provincial roads, waterways, and sheep trails. The project is complemented by an impressed-current cathodic protection system to safeguard the steel pipeline and by a remote monitoring system for the new structures.