Wastewater treatment plant serving the city of Manfredonia (FG)

Project details

Contracting Station:

Acquedotto Pugliese S.p.A.

Client:

Giovanni Putignano & Figli S.r.l.

Location:

Manfredonia (FG)

Job:

10/30/1103

Amount of Job:

€2,460,529.04

Start date:

11/8/2023

Delivery date:

22/11/2024

Sector:

Civil sewage treatment plants

"Work to bring the wastewater treatment plant serving the City of Manfredonia (FG) into compliance with Ministerial Decree 185/2003"

Manfredonia Water Treatment Plant
The project involves upgrading the wastewater treatment plant in Manfredonia (FG), which serves the urban area and the coastal towns, to the requirements of Ministerial Decree No. 185/2003 for the reuse of treated wastewater in agriculture, taking into account a current load of 89,724 PE and a projected future load of 107,760 PE. The planned works primarily involve the water system and include the construction of a third secondary clarifier with a diameter of 32 meters, complete with a sludge-scraping bridge, the lifting of recirculating and overflow sludge, a new distribution chamber, and related hydraulic connections; the installation of a ferric chloride dosing station for phosphorus removal and a bacterial consortium dosing station for the reduction of surfactants; the expansion of mechanical filtration with a new station operating in parallel with the existing one, equipped with two disc filters—one in service and one on standby—each with a capacity of 1,100 m³/h; the addition of an ultraviolet (UV) system to the existing disinfection tank, sized for a maximum flow rate of 1,795 m³/h. To manage flow rates exceeding 2.5 times the average flow rate, a dedicated line is also planned from the equalization tank to a new emergency disinfection tank using sodium hypochlorite, with a usable capacity of 247 m³. The existing sludge line will be integrated with the facilities serving the new sedimentation tank. Plans also include the preparation of a delivery point for treated water to the Capitanata Land Reclamation Consortium, via a pipeline extending to the boundary of the fence, a motorized gate, and a station for continuous monitoring of ammonium, nitrogen, and phosphorus, to regulate the flow to reuse or to the existing outfall. The project is completed by upgrading the electrical system to accommodate the new loads, decommissioning the interfering overhead line, constructing a new power distribution substation along the perimeter fence, and restoring the pavement affected by the pipeline installation.