“The Works Contract for Lot 3 included the installation of two new sewer collectors from Lezhe and Shengjin respectively to the new WWTP (Sewage Treatment Plant) in Shengjin completed in May 2011, and a return pipeline to discharge the purified effluent into the Drini River. The scope of work of Lot 3 includes:
– The construction of two new lift stations in Lezha and Shengjin including the Inlet Well, Pump Well, Valve Room and Control Building, Mechanical and Electrical works and miscellaneous works
– The construction of a new lift station in the sewage treatment plant including the Inlet Well, Pump Well, Valve Room and Control Building, Mechanical and Electrical works and miscellaneous works
– The construction of about 800 m of DN600 gravity sewer and 1,675 m of DN400 preemption from Shengjin
– The construction of about 1,500 m of gravity sewer from DN400 to DN600 and 3,505 m of DN400 preemption from Lezha
– The construction of approximately 4,650 m of DN500 preemption for treated effluent from the treatment plant to the point of discharge into the Drini River”